AP1000 PROJECTS CAP1400 FOAK PROJECT
SNPTC HAS THE ABILITY TO BE A MAIN CONTRACTOR FOR ENGINEERING, PROCUREMENT, PROJECT MANAGEMENT, CONSTRUCTION AND COMMISSIONING OF NPP. 

THE WORLD'S FIRST BATCH OF AP1000 PROJECTS

Zhejiang Sanmen NPP unit 1 will be connected to grid in 2018

THE WORLD'S FIRST BATCH OF AP1000 PROJECTS

Haiyang NPP Phase II project, Sanmen NPP Phase II project, Lufeng NPP Phase I project andother CAP1000 follow-up projects are ready for construction.
  • Haiyang Phase II
  • Sanmen Phase II
  • Lufeng Phase I
SNPTC is the EPC contractor for AP1000 NPP, two CAP1400 FOAK units, and CAP1000 follow-up projects (including Haiyang Phase II, Sanmen Phase II, Lufeng Phase I).
More than 92% construction drawings of CAP1400 FOAK project are completed. Long lead equipment manufacturing is on schedule. Preparations for the FCD of the unit 1 NI were completed.
CAP1400 FOAK Project site in Shidao Bay, Rongcheng Shandong Province in China